In Progress Roads and Transport Engineering Department

Central Market Road Upgrade

Rehabilitate the main commercial corridor with safer sidewalks and traffic calming.

Current progress
68%
Budget
ILS 2,450,000
Location
Central Market Area

Project scope

The project covers resurfacing 1.8 km of roadway, new sidewalks, safer crossings, and efficient lighting around the central market.

Updates

2 updates

Sidewalk installation started

2026-05-10 68%

Sidewalk paving and accessible tactile elements have started.

Underground works completed

2026-03-18 48%

Stormwater drainage and underground utility works were completed in the northern section.

Photo gallery

First resurfacing segment
First resurfacing segment
New sidewalk works
New sidewalk works

Project location

Central Market Area

Related projects

Retaining Wall Construction Project
10%

تعلن بلدية بيت عور التحتا عن المباشرة في تنفيذ مشروع بناء الجدران الاستنادية، والممول من صندوق إقراض وتطوير الهيئات المحلية ، وذلك ضمن جهود البلدية المتواصلة لتطوير البنية التحتية والارتقاء بشبكة الطرق في البلدة حيث باشرت البلدية باعمال الحفر في شارع المغراقة ( بجانب عيادة د. جميل المشني ). اسم البرنامج: برنامج التعافي وخلق فرص عمل . رقم المشروع: SRJCP-1.1-08-301820-1 ويُعد هذا المشروع خطوةً أساسية لتهيئة الطريق وتجهيزه تمهيدًا لتنفيذ أعمال التعبيد القادمة، بما يسهم في تحسين السلامة المرورية، وتسهيل حركة المواطنين، والارتقاء بجودة الخدمات المقدمة. وتتقدم البلدية بجزيل الشكر إلى صندوق إقراض وتطوير الهيئات المحلية على دعمه المتواصل للمشاريع التنموية، كما تدعو المواطنين الكرام إلى التعاون مع طواقم العمل وعدم ركن السيارات على جوانب الطريق وكذلك سلك مسار الشارع الرئيسي بسبب اعمال الحفريات القائمة حاليا والالتزام بإرشادات السلامة خلال فترة التنفيذ، حرصًا على سلامة الجميع وسرعة إنجاز المشروع

Bus Terminal Traffic Loop
5%

Reorganize entry and exit flows with dedicated pedestrian and bus lanes.